lobbyTO

Early warning

Upcoming at council

Open lobbying registrations that are not yet linked to any council or committee agenda item, with an estimated window for when a linked item may appear, based on how long past registrations on the same topic took.

Open registrations without a linked item
1,609
1,609 registrations
With an estimated window
1,589
99% of open registrations
Windows that held in the backtest
—
No registration could be evaluated yet
Lead-time sample
1,207
Registrations with a published link

1,609 open registrations without a linked item; 1,589 have an estimated window. Lead times are drawn from 1,207 registrations with a published link.

Open registrations by topic

Top 10

Topic spikes in the last 12 months

New registrations vs previous 12-month average
Data table· 26 rows

Open registrations: Waterfront revitalization and Port Lands

All topics →

12 of 21 shown as cards; all are in the data table.

Data table· 21 rows
RegistrationClientTopicApprovedEstimated window for a linked item
SM37488
Ongoing operations at the 95 Queens Quay East facility
Redpath Sugar Ltd.Waterfront revitalization and Port Lands12 March 20269 January 2027 to 28 February 2031
from this topic's lead times (n=23)
SM37491
Use and regulation of rental PWC's along Toronto's waterfront
Jetti IncWaterfront revitalization and Port Lands12 March 20269 January 2027 to 28 February 2031
from this topic's lead times (n=23)
SM36791
Ongoing operations at their facilities at 95 Queens Quay East
Redpath Sugar Ltd.Waterfront revitalization and Port Lands14 July 202517 March 2027 to 28 January 2032
from this topic's lead times (n=14)
SM37629
Introduce elevated waterfront transit concept with City of Toronto officials as a potential alternative or complement to existing waterfront transit plans, including opportunities related to mobility, connectivity, econo
WGD ConsultingWaterfront revitalization and Port Lands19 May 202618 March 2027 to 7 May 2031
from this topic's lead times (n=23)
SM37710
Discuss Beach, Park, Waterfront, & Tourism Accessibility, Access, Mobility Facilitation in the Great Outdoors & Adventure in the City of TORONTO. Presenting the most innovative, cost-effective products, services, solutio
Watts Accessibility ConsultingWaterfront revitalization and Port Lands10 June 20269 April 2027 to 29 May 2031
from this topic's lead times (n=23)
SM37889
Matters relating to development approvals for the lands municipally identified as 25 and 35 Queens Quay East
Pier 27 Toronto (North) Inc.Waterfront revitalization and Port Lands25 August 202616 June 2027 to 14 March 2030
from this topic's lead times (n=26)
SM37928
Ongoing operations at the 95 Queens Quay East facility
Redpath Sugar Ltd.Waterfront revitalization and Port Lands10 September 202625 June 2027 to 10 July 2029
from this topic's lead times (n=28)
SM26113
Assisting with development of 1926 Lakeshore Boulevard West.
Diamante Development CorporationWaterfront revitalization and Port Lands26 April 20185 August 2027 to 26 May 2030
from all topics' lead times (n=62)
SM28818
Potential Redevelopment Discussions re 200 Queen's Quay West
Diamond CorpWaterfront revitalization and Port Lands5 September 201920 August 2027 to 1 October 2030
from all topics' lead times (n=95)
SM27007
Proposed development of 3526 Lake Shore Blvd. West and related activities.
Minto Communities Inc.Waterfront revitalization and Port Lands13 November 201820 August 2027 to 5 November 2030
from all topics' lead times (n=73)
SM29686
East Harbour Development lands
The Cadillac Fairview Corporation LimitedWaterfront revitalization and Port Lands3 February 202024 August 2027 to 18 June 2030
from all topics' lead times (n=113)
SM31140
Block 9/10 Under Gardiner PART OF LOT 20, INDEX PLAN D970, DESIGNATED AS PARTS 6 AND 7, PLAN 66R15355, SAVE AND EXCEPT PARTS 6 AND 24, PLAN 66R16838, PARTS 1, 2, 5 AND 6 PLAN 66R24004, AND PARTS 1, 2, AND 3, PLAN 66R2486
Concord AdexWaterfront revitalization and Port Lands19 January 202122 September 2027 to 2 November 2030
from all topics' lead times (n=152)
SM34354
Mount Pleasant Groups lands and operations within the City of Toronto.
Mount Pleasant GroupWaterfront revitalization and Port Lands6 April 20234 November 2027 to 25 June 2031
from all topics' lead times (n=261)
SM34998
Ongoing operations at Bluffers Park Marina
Bluffers Park Marina LimiteWaterfront revitalization and Port Lands7 November 202320 November 2027 to 13 August 2031
from all topics' lead times (n=302)
SM34951
Quayside (257-259 and 291 Lakeshore Boulevard Street East, 333 Lakeshore Boulevard Street East)
Dream Asset Management CorporationWaterfront revitalization and Port Lands25 October 202320 November 2027 to 5 August 2031
from all topics' lead times (n=298)
SM34555
Introducing Pinnacle as the new owners of the site. 215 Lakeshore Ave. East
Mondiale Development LTD.Waterfront revitalization and Port Lands16 June 202325 November 2027 to 23 June 2031
from all topics' lead times (n=273)
SM31948
Block 7 - 1001 Sheppard Avenue East Block 11 - 35 McMahon Drive Block 15 - 40 Esther Shiner Blvd.
Concord AdexWaterfront revitalization and Port Lands28 June 202125 November 2027 to 21 January 2031
from all topics' lead times (n=169)
SM32598
East Harbour Development lands
The Cadillac Fairview Corporation LimitedWaterfront revitalization and Port Lands24 November 20214 December 2027 to 16 February 2031
from all topics' lead times (n=186)
SM32599
East Harbour Development lands
The Cadillac Fairview Corporation LimitedWaterfront revitalization and Port Lands24 November 20214 December 2027 to 16 February 2031
from all topics' lead times (n=186)
SM22798
To discuss potential approaches to and form of redevelopment of property including any or all of the Intercontinental Hotel, the Metro Toronto Convention Centre, 277 Front Street, 315 Front Street, and 325 Front Street.
OPGI Management GP Inc.Waterfront revitalization and Port Lands19 February 201617 January 2028 to 19 May 2030
from all topics' lead times (n=26)
SM18742
Ongoing opertations at their facilities at 95 Queens Quay East
Redpath Sugar Ltd.Waterfront revitalization and Port Lands3 December 2012No estimate: not enough published links with lead times yet

How well the window has worked

—No registration could be evaluated in the backtest period.

Backtest on registrations whose first linked item fell between 1 December 2018 and 14 November 2022: no registration could be evaluated (0 of 0 evaluable; 0 registrations with a published first linked item in the period). Each window uses only lead times known before the registration was approved.

Method: iqr-conditional-v1: window = interquartile range of lead times known before approval (topic if n>=10, else pooled); hit when the first published linked item falls inside.

How the window is estimated

  1. Lead timeDays from a registration's approval to its first published linked agenda item.
  2. ConditionKeep past lead times longer than the days this registration has already waited.
  3. WindowThe middle half (25th to 75th percentile) of those lead times.

A window is a statistical estimate from past registrations, not a prediction that council will consider the matter. Many registrations never lead to an agenda item.