Topics · Planning and development
Site plan approval
Site plan control applications: building design, access, landscaping for one site.
- Open registrations without a linked item
- 297
New registrations per month
Data table
| Quarter | Registrations | Spike month | Total |
|---|---|---|---|
| 2022-01 | 12 | 0 | 12 |
| 2022-02 | 11 | 0 | 11 |
| 2022-03 | 0 | 17 | 17 |
| 2022-04 | 8 | 0 | 8 |
| 2022-05 | 6 | 0 | 6 |
| 2022-06 | 12 | 0 | 12 |
| 2022-07 | 5 | 0 | 5 |
| 2022-08 | 6 | 0 | 6 |
| 2022-09 | 12 | 0 | 12 |
| 2022-10 | 6 | 0 | 6 |
| 2022-11 | 1 | 0 | 1 |
| 2022-12 | 4 | 0 | 4 |
| 2023-01 | 15 | 0 | 15 |
| 2023-02 | 0 | 21 | 21 |
| 2023-03 | 6 | 0 | 6 |
| 2023-04 | 12 | 0 | 12 |
| 2023-05 | 3 | 0 | 3 |
| 2023-06 | 7 | 0 | 7 |
| 2023-07 | 7 | 0 | 7 |
| 2023-08 | 8 | 0 | 8 |
| 2023-09 | 7 | 0 | 7 |
| 2023-10 | 6 | 0 | 6 |
| 2023-11 | 12 | 0 | 12 |
| 2023-12 | 8 | 0 | 8 |
| 2024-01 | 9 | 0 | 9 |
| 2024-02 | 9 | 0 | 9 |
| 2024-03 | 8 | 0 | 8 |
| 2024-04 | 5 | 0 | 5 |
| 2024-05 | 7 | 0 | 7 |
| 2024-06 | 4 | 0 | 4 |
| 2024-07 | 0 | 12 | 12 |
| 2024-08 | 4 | 0 | 4 |
| 2024-09 | 9 | 0 | 9 |
| 2024-10 | 6 | 0 | 6 |
| 2024-11 | 12 | 0 | 12 |
| 2024-12 | 6 | 0 | 6 |
| 2025-01 | 7 | 0 | 7 |
| 2025-02 | 4 | 0 | 4 |
| 2025-03 | 6 | 0 | 6 |
| 2025-04 | 7 | 0 | 7 |
| 2025-05 | 3 | 0 | 3 |
| 2025-06 | 6 | 0 | 6 |
| 2025-07 | 3 | 0 | 3 |
| 2025-08 | 8 | 0 | 8 |
| 2025-09 | 3 | 0 | 3 |
| 2025-10 | 8 | 0 | 8 |
| 2025-11 | 11 | 0 | 11 |
| 2025-12 | 2 | 0 | 2 |
| 2026-01 | 0 | 13 | 13 |
| 2026-02 | 6 | 0 | 6 |
| 2026-03 | 4 | 0 | 4 |
| 2026-04 | 6 | 0 | 6 |
| 2026-05 | 8 | 0 | 8 |
| 2026-06 | 3 | 0 | 3 |
| 2026-07 | 10 | 0 | 10 |
| 2026-08 | 6 | 0 | 6 |
| 2026-09 | 1 | 0 | 1 |
| 2026-10 | 1 | 0 | 1 |
| 2026-11 | 0 | 0 | 0 |
Time to a linked agenda item
n=78Median 689 days from approval to the first linked agenda item (middle half 284 to 1310 days; n=78 registrations with a published link).
Registration status
Email alerts · at most one a day
Open registrations without a linked item
- 15 January 2027 – 18 March 2031Tribute CommunitiesSM31653 · approved 7 May 2021
- 1 March 2027 – 2 May 2031Sequoia Stockyards LPSM31887 · approved 21 June 2021
- 23 March 2027 – 24 May 2031Goldman Group, TheSM32037 · approved 13 July 2021
- 14 April 2027 – 3 February 20308-16 Locust Street LPSM34393 · approved 11 April 2023
- 16 April 2027 – 17 June 2031RC 3180 DUFFERING LPSM32166 · approved 6 August 2021
- 20 April 2027 – 13 February 2030Marlin Spring DevelopmentsSM37544 · approved 8 April 2026
- 21 April 2027 – 14 February 2030Times Group CorporationSM37547 · approved 9 April 2026
- 25 April 2027 – 27 February 2030ExtendicareSM37451 · approved 3 March 2026
- 26 April 2027 – 27 June 2031RioCan Management Inc.SM32215 · approved 16 August 2021
- 26 April 2027 – 27 June 2031Sheppard Residences Limited PartnershipSM32216 · approved 16 August 2021
- 28 April 2027 – 19 February 2030Pinnacle InternationalSM37522 · approved 31 March 2026
- 5 May 2027 – 28 February 2030Streamliner Properties Inc.SM37589 · approved 23 April 2026
12 of 50 shown as cards; all are in the data table.
Data table· 50 rows
| Registration | Client | Topic | Approved | Estimated window for a linked item |
|---|---|---|---|---|
| SM31653 Proposed mixed use development at 148-158 Avenue Road and 220-234 Davenport Road | Tribute Communities | Site plan approval | 7 May 2021 | 15 January 2027 to 18 March 2031 from this topic's lead times (n=11) |
| SM31887 1799 St. Clair Avenue West | Sequoia Stockyards LP | Site plan approval | 21 June 2021 | 1 March 2027 to 2 May 2031 from this topic's lead times (n=11) |
| SM32037 1001 Ellesmere Road | Goldman Group, The | Site plan approval | 13 July 2021 | 23 March 2027 to 24 May 2031 from this topic's lead times (n=11) |
| SM34393 8 – 16 Locust Street | 8-16 Locust Street LP | Site plan approval | 11 April 2023 | 14 April 2027 to 3 February 2030 from this topic's lead times (n=21) |
| SM32166 Residential & Mixed-use project 2300 Yonge Street, Suite 500, Toronto ON | RC 3180 DUFFERING LP | Site plan approval | 6 August 2021 | 16 April 2027 to 17 June 2031 from this topic's lead times (n=11) |
| SM37544 316-336 Campbell Avenue Planning and Permit Approvals | Marlin Spring Developments | Site plan approval | 8 April 2026 | 20 April 2027 to 13 February 2030 from this topic's lead times (n=68) |
| SM37547 1913-1951 Yonge Street, 10-11 Davisville Avenue, 17-21 Millwood Road | Times Group Corporation | Site plan approval | 9 April 2026 | 21 April 2027 to 14 February 2030 from this topic's lead times (n=68) |
| SM37451 Planning applications related to 1020 McNicoll Avenue | Extendicare | Site plan approval | 3 March 2026 | 25 April 2027 to 27 February 2030 from this topic's lead times (n=63) |
| SM32215 Residential and mixed-use project located at 3180 Dufferin St | RioCan Management Inc. | Site plan approval | 16 August 2021 | 26 April 2027 to 27 June 2031 from this topic's lead times (n=11) |
| SM32216 Proposed residential building at 1100 Sheppard Avenue West | Sheppard Residences Limited Partnership | Site plan approval | 16 August 2021 | 26 April 2027 to 27 June 2031 from this topic's lead times (n=11) |
| SM37522 1-7 Yonge Street (south Block) | Pinnacle International | Site plan approval | 31 March 2026 | 28 April 2027 to 19 February 2030 from this topic's lead times (n=67) |
| SM37589 Matters relating to the development of the lands municipally identified as 110 Sheppard Avenue East. | Streamliner Properties Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 28 February 2030 from this topic's lead times (n=68) |
| SM37590 Matters relating to the development of the land municipally identified as 271 Russell Hill Road | Newpoint Developments Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 28 February 2030 from this topic's lead times (n=68) |
| SM37591 Matters relating to the development of the land municipally identified as 271 Russell Hill Road | Newpoint Developments Inc. | Site plan approval | 23 April 2026 | 5 May 2027 to 28 February 2030 from this topic's lead times (n=68) |
| SM32246 Delay with issuance of Notice of Approval Conditions - 2787 Eglinton Avenue East | Mattamy (Danforth) Limited | Site plan approval | 26 August 2021 | 6 May 2027 to 7 July 2031 from this topic's lead times (n=11) |
| SM32477 50 Wilson Heights | Deltera Inc. | Site plan approval | 25 October 2021 | 6 May 2027 to 25 May 2031 from this topic's lead times (n=12) |
| SM21712 350-354 Adelaide St. W. and 102-118 Peter St. Proposed Mixed-Use Development. | Graywood Developments Ltd. | Site plan approval | 24 April 2015 | 10 May 2027 to 11 March 2030 from all topics' lead times (n=21) |
| SM23835 462 Eastern Avenue Proposed Mixed Use Development | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 14 May 2027 to 14 August 2030 from all topics' lead times (n=35) |
| SM23836 1771 St Clair Avenue West Proposed residential development with retail at grade | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 14 May 2027 to 14 August 2030 from all topics' lead times (n=35) |
| SM23837 1779 St Clair Avenue West Proposed residential development with retail at grade | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 14 May 2027 to 14 August 2030 from all topics' lead times (n=35) |
| SM23838 250 Lawrence Avenue West Proposed residential development | Graywood Developments Ltd. | Site plan approval | 20 December 2016 | 14 May 2027 to 14 August 2030 from all topics' lead times (n=35) |
| SM37616 Development approvals on a site in a Core Employment Area (65 Heward Ave) | Heward Studio Investments Inc. | Site plan approval | 5 May 2026 | 17 May 2027 to 12 March 2030 from this topic's lead times (n=68) |
| SM37592 Matters relating to the development of the lands municipally identified as 110 Sheppard Avenue East. | Streamliner Properties Inc. | Site plan approval | 6 May 2026 | 18 May 2027 to 13 March 2030 from this topic's lead times (n=68) |
| SM34668 1100, 1120-1130 & 1150 Caledonia Rd | OPGI Management GP Inc. | Site plan approval | 27 July 2023 | 20 May 2027 to 19 May 2030 from this topic's lead times (n=24) |
| SM37623 Development approvals on a site in a Core Employment Area (65 Heward Ave) | Heward Studio Investments Inc. | Site plan approval | 8 May 2026 | 20 May 2027 to 15 March 2030 from this topic's lead times (n=68) |
| SM37627 Seeking guidance, comments and feedback for a development application at 515-519 Jarvis St. | Jarvis Mansions (Toronto) Limited | Site plan approval | 13 May 2026 | 25 May 2027 to 20 March 2030 from this topic's lead times (n=68) |
| SM37628 Potential planning applications for 515-519 Jarvis Street | Farhi Holdings Corporation | Site plan approval | 13 May 2026 | 25 May 2027 to 20 March 2030 from this topic's lead times (n=68) |
| SM37631 Development approvals and ongoing development support at 8-18 Locust Street, Toronto | Fengate Capital Management Limited | Site plan approval | 14 May 2026 | 26 May 2027 to 21 March 2030 from this topic's lead times (n=68) |
| SM32346 2116 Eglinton Avenue West | Oldstonehenge Development Corporation | Site plan approval | 16 September 2021 | 27 May 2027 to 28 July 2031 from this topic's lead times (n=11) |
| SM23851 5415, 5421-5429, 5453, 5475, 5481, 5485 and 5487 Dundas Street West and 15 and 25 Shorncliffe Road | Mondiale Development LTD. | Site plan approval | 3 January 2017 | 28 May 2027 to 28 August 2030 from all topics' lead times (n=35) |
| SM34545 Development and planning application matters related to 1 & 2-14 Sumach Street, as well as City property abutting the site. | Block (Sumach) Developments Limited | Site plan approval | 6 June 2023 | 29 May 2027 to 30 March 2030 from this topic's lead times (n=22) |
| SM34043 Planning application for the redevelopment of 2451 Danforth Avenue. | First capital Realty | Site plan approval | 16 January 2023 | 30 May 2027 to 28 December 2030 from this topic's lead times (n=19) |
| SM34046 Development and construction coordination matters related to purpose-built rental apartment at 260 King Street East. | Fitzrovia Residential Inc. | Site plan approval | 16 January 2023 | 30 May 2027 to 28 December 2030 from this topic's lead times (n=19) |
| SM37664 Education of green earth retaining systems for the City. ECO Friendly Green Infrastructure | Trexiana Flex MSE | Site plan approval | 20 May 2026 | 30 May 2027 to 13 March 2030 from this topic's lead times (n=69) |
| SM34541 The finalization of the approvals necessary for the construction of an approved 16 storey residential mixed-use development. 53 Sheppard Avenue West | Sheppard Bogert Developments Limited | Site plan approval | 8 June 2023 | 31 May 2027 to 1 April 2030 from this topic's lead times (n=22) |
| SM34628 Development Applications at 665-671 Sheppard Ave West. | Reego Xue (Mingxing Xue) | Site plan approval | 12 July 2023 | 2 June 2027 to 5 May 2030 from this topic's lead times (n=23) |
| SM37749 3450 Dufferin Street | Fitzrovia | Site plan approval | 2 July 2026 | 2 June 2027 to 25 April 2030 from this topic's lead times (n=72) |
| SM37683 Easement agreements with regards to the planning and development application for 110 Maitland Street. | Minto (110 Maitland) GP Inc. | Site plan approval | 27 May 2026 | 3 June 2027 to 20 March 2030 from this topic's lead times (n=70) |
| SM34557 Providing an update on the status of the development application for 1303 Yonge Street. | Aspen Ridge Homes | Site plan approval | 13 June 2023 | 5 June 2027 to 6 April 2030 from this topic's lead times (n=22) |
| SM34711 We have been assisting our client with their site plan approval application for 68 East Liberty Street. | 2195114 Ontario Inc. c/o Terry Tsianos | Site plan approval | 14 August 2023 | 7 June 2027 to 5 June 2030 from this topic's lead times (n=25) |
| SM31645 3650 Danforth Ave- Planning and Development applications and items for an Industrial Building. | First Gulf | Site plan approval | 5 May 2021 | 8 June 2027 to 26 June 2031 from this topic's lead times (n=10) |
| SM32375 Molson Coors is making a large capital investment at its Toronto Brewer that requires demolition and building permits. | Molson Coors Canada 2005 | Site plan approval | 28 September 2021 | 8 June 2027 to 9 August 2031 from this topic's lead times (n=11) |
| SM34078 Mixed-use Development Application at 685 Warden Avenue, Toronto, ON. | CP REIT Ontario Properties Limited | Site plan approval | 25 January 2023 | 8 June 2027 to 6 January 2031 from this topic's lead times (n=19) |
| SM32378 Development of 1880 Eglinton Avenue East | Choice Properties | Site plan approval | 29 September 2021 | 9 June 2027 to 10 August 2031 from this topic's lead times (n=11) |
| SM37767 905 Middlefield Rd | EM Dynamics | Site plan approval | 9 July 2026 | 9 June 2027 to 2 May 2030 from this topic's lead times (n=72) |
| SM21855 34 Southport Street, Toronto. | State Building Group | Site plan approval | 25 May 2015 | 10 June 2027 to 11 April 2030 from all topics' lead times (n=21) |
| SM34090 Matters relating to planning approavals for the northeast quadrant of Yonge Street at Gerrard Street East including the expansion of the existing at-risk youth she | Covenant House | Site plan approval | 27 January 2023 | 10 June 2027 to 8 January 2031 from this topic's lead times (n=19) |
| SM37772 1-3 Concorde Gate and 10-12 Concorde Place: mixed-use redevelopment of the Concorde Corporate Centre lands. | Fengate Asset Management | Site plan approval | 13 July 2026 | 13 June 2027 to 6 May 2030 from this topic's lead times (n=72) |
| SM34737 120-134 Sherbourne Street and 225-229 Queen Street East. | Dash Urban Inc. | Site plan approval | 21 August 2023 | 14 June 2027 to 12 June 2030 from this topic's lead times (n=25) |
| SM37773 Lobbying for Planning and Development Application for the following project: 53 & 55 Widdicombe Hill Blvd | QuadReal Real Property Group Limited Partnership | Site plan approval | 14 July 2026 | 14 June 2027 to 7 May 2030 from this topic's lead times (n=72) |
Most recent registrations
Latest 50- Sutera Canada Inc.SM38003 · 15 October 2026 · active
- Khalil AssaadSM37962 · 30 September 2026 · active
- Minto (3526 Lakeshore) Inc.SM37895 · 27 August 2026 · active
- Minto (3526 Lakeshore) Inc.SM37881 · 24 August 2026 · active
- Fora DevelopmentsSM37869 · 17 August 2026 · active
- Fora DevelopmentsSM37868 · 17 August 2026 · active
- Fora DevelopmentsSM37866 · 17 August 2026 · active
- Fora DevelopmentsSM37864 · 17 August 2026 · active
- Newpoint Developments Inc.SM37812 · 23 July 2026 · active
- ExtendicareSM37782 · 16 July 2026 · active
Data table· 50 rows
| Registration | Client | Approved | Status | Topic source |
|---|---|---|---|---|
| SM38003 | Sutera Canada Inc. | 15 October 2026 | active | Decision model |
| SM37962 | Khalil Assaad | 30 September 2026 | active | Decision model |
| SM37895 | Minto (3526 Lakeshore) Inc. | 27 August 2026 | active | Decision model |
| SM37881 | Minto (3526 Lakeshore) Inc. | 24 August 2026 | active | Decision model |
| SM37869 | Fora Developments | 17 August 2026 | active | Decision model |
| SM37868 | Fora Developments | 17 August 2026 | active | Decision model |
| SM37866 | Fora Developments | 17 August 2026 | active | Decision model |
| SM37864 | Fora Developments | 17 August 2026 | active | Decision model |
| SM37812 | Newpoint Developments Inc. | 23 July 2026 | active | Decision model |
| SM37782 | Extendicare | 16 July 2026 | active | Decision model |
| SM37781 | Extendicare | 16 July 2026 | active | Decision model |
| SM37780 | Extendicare | 16 July 2026 | closed | Decision model |
| SM37779 | Extendicare | 16 July 2026 | active | Decision model |
| SM37778 | Extendicare | 16 July 2026 | active | Decision model |
| SM37773 | QuadReal Real Property Group Limited Partnership | 14 July 2026 | active | Decision model |
| SM37772 | Fengate Asset Management | 13 July 2026 | active | Decision model |
| SM37767 | EM Dynamics | 9 July 2026 | active | Decision model |
| SM37749 | Fitzrovia | 2 July 2026 | active | Decision model |
| SM37720 | Huifeng Canada Inc. | 15 June 2026 | active | Decision model |
| SM37704 | HNC Bathurst Street Inc. | 8 June 2026 | active | Decision model |
| SM37702 | HC Lower JCT Holdings LP | 8 June 2026 | active | Decision model |
| SM37683 | Minto (110 Maitland) GP Inc. | 27 May 2026 | active | Decision model |
| SM37664 | Trexiana Flex MSE | 20 May 2026 | active | Decision model |
| SM37631 | Fengate Capital Management Limited | 14 May 2026 | active | Decision model |
| SM37628 | Farhi Holdings Corporation | 13 May 2026 | active | Decision model |
| SM37627 | Jarvis Mansions (Toronto) Limited | 13 May 2026 | active | Decision model |
| SM37623 | Heward Studio Investments Inc. | 8 May 2026 | active | Decision model |
| SM37592 | Streamliner Properties Inc. | 6 May 2026 | active | Decision model |
| SM37616 | Heward Studio Investments Inc. | 5 May 2026 | active | Decision model |
| SM37591 | Newpoint Developments Inc. | 23 April 2026 | active | Decision model |
| SM37590 | Newpoint Developments Inc. | 23 April 2026 | active | Decision model |
| SM37589 | Streamliner Properties Inc. | 23 April 2026 | active | Decision model |
| SM37573 | JCD Property Ltd. | 16 April 2026 | closed | Decision model |
| SM37547 | Times Group Corporation | 9 April 2026 | active | Decision model |
| SM37544 | Marlin Spring Developments | 8 April 2026 | active | Decision model |
| SM37522 | Pinnacle International | 31 March 2026 | active | Decision model |
| SM37516 | Collecdev Markee Limited Partnership | 27 March 2026 | closed by lro | Decision model |
| SM37515 | Collecdev Markee Limited Partnership | 27 March 2026 | closed by lro | Decision model |
| SM37451 | Extendicare | 3 March 2026 | active | Decision model |
| SM37414 | Starlight Investments | 18 February 2026 | active | Decision model |
| SM37398 | CastlepointNuma | 13 February 2026 | active | Decision model |
| SM37397 | Southport Street Development Corporation | 13 February 2026 | active | Decision model |
| SM37318 | Format Group Inc. | 6 February 2026 | closed by lro | Decision model |
| SM37317 | Format Group Inc. | 6 February 2026 | closed by lro | Decision model |
| SM37316 | Format Group Inc. | 6 February 2026 | closed by lro | Decision model |
| SM37360 | Prologis, Inc. | 27 January 2026 | active | Decision model |
| SM37359 | Prologis, Inc. | 27 January 2026 | active | Decision model |
| SM37355 | KG Group | 26 January 2026 | active | Decision model |
| SM37353 | Altree Developments Inc. | 26 January 2026 | active | Decision model |
| SM37345 | SunCor Energy Inc. | 22 January 2026 | closed by lro | Decision model |