lobbyTO

Early warning

Upcoming at council

Open lobbying registrations that are not yet linked to any council or committee agenda item, with an estimated window for when a linked item may appear, based on how long past registrations on the same topic took.

Open registrations without a linked item
1,653
1,653 registrations
With an estimated window
1,625
98% of open registrations
Windows that held in the backtest
—
No registration could be evaluated yet
Lead-time sample
1,216
Registrations with a published link

1,653 open registrations without a linked item; 1,625 have an estimated window. Lead times are drawn from 1,216 registrations with a published link.

Open registrations by topic

Top 10

Topic spikes in the last 12 months

New registrations vs previous 12-month average
Data table· 29 rows

Open registrations: Energy supply and utilities

All topics →

12 of 25 shown as cards; all are in the data table.

Data table· 25 rows
RegistrationClientTopicApprovedEstimated window for a linked item
SM38001
To discuss preparations for designing a proposal for Toronto Third Line, Ontario's proposed new underwater high-voltage direct current (HVDC) transmission connection
National Grid USA Service Company, Inc.Energy supply and utilities21 October 202622 February 2027 to 9 November 2031
from this topic's lead times (n=16)
SM36789
E-Pro Canada will engage with City staff regarding opportunities to provide EV charging, solar, geothermal, and energy audit services through relevant programs, projects, funding opportunities, and procurement processes.
CANADA SUNSHINE CONTRACTING INCEnergy supply and utilities30 July 202519 August 2027 to 21 August 2031
from all topics' lead times (n=514)
SM29681
Expansion and Existing Shaft at 28 Rees, Toronto ON, M5V 3V6 (John Street Pumping Station)
Enwave Energy CorporationEnergy supply and utilities27 January 202022 August 2027 to 25 June 2030
from all topics' lead times (n=102)
SM18831
To accelerate the commercialization of the most reliable, cost-effective and efficient energy storage technologies through the planning and development of energy storage solutions.
NRStor Inc.Energy supply and utilities7 February 201823 August 2027 to 12 August 2030
from all topics' lead times (n=51)
SM26612
Assisting with the development of 410 Front Street West. Toronto for district energy easements within municipal parks.
Enwave Energy CorporationEnergy supply and utilities22 August 201826 September 2027 to 17 September 2030
from all topics' lead times (n=59)
SM37726
Development and delivery of electricity transmission infrastructure projects in Toronto, including municipal permits, planning approvals, rights-of-way access, and related city policies, programs and coordination require
Fortis Inc.Energy supply and utilities17 June 202617 October 2027 to 15 April 2034
from this topic's lead times (n=12)
SM37741
Introduce and educate on the use of commercial battery systems (BESS)
Total Power LimitedEnergy supply and utilities23 June 202623 October 2027 to 21 April 2034
from this topic's lead times (n=12)
SM35787
Meet with the City to discuss utility tunnels and related infrastructure.
Mott MacDonald CanadaEnergy supply and utilities25 July 20244 November 2027 to 14 August 2031
from all topics' lead times (n=361)
SM37783
Assisting with the development of 410 Front Street West. Toronto for district energy easements within municipal parks.
Enwave Energy CorporationEnergy supply and utilities17 July 202616 November 2027 to 15 May 2034
from this topic's lead times (n=12)
SM37784
Expansion and Existing Shaft at 28 Rees, Toronto ON, M5V 3V6 (John Street Pumping Station)
Enwave Energy CorporationEnergy supply and utilities17 July 202616 November 2027 to 15 May 2034
from this topic's lead times (n=12)
SM34468
Communicating with municipal officials about energy-related matters, including the operation, maintenance and enhancement of fuel storage facilities, infrastructure, and pipelines in the Greater Toronto Area.
Imperial Oil LimitedEnergy supply and utilities3 May 20231 December 2027 to 26 April 2031
from all topics' lead times (n=252)
SM37149
On behalf of client, Emera Inc., seeking to understand the City of Toronto's position and value proposition associated with a new high voltage electricity transmission line, which the Ontario Government has proposed to b
Emera Inc.Energy supply and utilities18 November 20257 December 2027 to 2 November 2033
from this topic's lead times (n=10)
SM37550
Issues and decisions regarding energy policy and markets; transmission and generation development andoperation; regulatory compliance for electricity generation and transmission
Emera Inc.Energy supply and utilities10 April 202624 December 2027 to 2 March 2034
from this topic's lead times (n=11)
SM37553
Issues and decisions regarding energy policy and markets; transmission and generation development and operation; regulatory compliance for electricity generation and transmission
NextEra Energy Canadian Operating Services, Inc.Energy supply and utilities13 April 202627 December 2027 to 5 March 2034
from this topic's lead times (n=11)
SM37554
Issues and decisions regarding energy policy and markets; transmission and generation development and operation; regulatory compliance for electricity generation and transmission
Emera Inc.Energy supply and utilities13 April 202627 December 2027 to 5 March 2034
from this topic's lead times (n=11)
SM37567
Early engagement with utilities, infrastructure stakeholders, and public office holders on route-to-market approach, including procurement strategy, delivery models, and coordination of construction activities and relate
Barhale Canada Inc.Energy supply and utilities15 April 202629 December 2027 to 7 March 2034
from this topic's lead times (n=11)
SM37235
Emera is interested in electricity matters including re: generation, transmission & distribution and IESO priorities such as the Integrated Regional Resource Plan for Toronto including the proposed Toronto Third Line sub
Emera Inc.Energy supply and utilities16 December 20254 January 2028 to 30 November 2033
from this topic's lead times (n=10)
SM34059
Ensuring the safe use and handling of propane within city limits
Canadian Propane AssociationEnergy supply and utilities18 January 202320 January 2028 to 8 April 2031
from all topics' lead times (n=233)
SM37311
Discussions related to Toronto's consideration of clean electricity infrastructure
Power Workers' UnionEnergy supply and utilities13 January 20261 February 2028 to 28 December 2033
from this topic's lead times (n=10)
SM37673
Issues and decisions regarding energy policy and markets; transmission and generation development and operation; regulatory compliance for electricity generation and transmission
NextEra Energy Canadian Operating Services, Inc.Energy supply and utilities22 May 20264 February 2028 to 13 April 2034
from this topic's lead times (n=11)
SM37674
Issues and decisions regarding energy policy and markets; transmission and generation development andoperation; regulatory compliance for electricity generation and transmission
Emera Inc.Energy supply and utilities22 May 20264 February 2028 to 13 April 2034
from this topic's lead times (n=11)
SM37696
B. (2) Indigenous owned utility product and utility equipment company striving to supply and support the City of Toronto with goods and services.
True North Power Tech IncEnergy supply and utilities3 June 202616 February 2028 to 25 April 2034
from this topic's lead times (n=11)
SM37365
Issues and decisions regarding energy policy and markets; transmission and generation development and operation; regulatory compliance for electricity generation and transmission.
NextEra Energy Canadian Operating Services, Inc.Energy supply and utilities3 February 202622 February 2028 to 18 January 2034
from this topic's lead times (n=10)
SM37396
Issues and decisions regarding energy policy and markets; transmission and generation development and operation; regulatory compliance for electricity generation and transmission
NextEra Energy Canadian Operating Services, Inc.Energy supply and utilities12 February 20262 March 2028 to 27 January 2034
from this topic's lead times (n=10)
SM16939
To discuss our power distribution equipment and systems and related services.
Siemens Canada LimitedEnergy supply and utilities28 October 2011No estimate: not enough published links with lead times yet

How well the window has worked

—No registration could be evaluated in the backtest period.

Backtest on registrations whose first linked item fell between 1 December 2018 and 14 November 2022: no registration could be evaluated (0 of 0 evaluable; 0 registrations with a published first linked item in the period). Each window uses only lead times known before the registration was approved.

Method: iqr-conditional-v1: window = interquartile range of lead times known before approval (topic if n>=10, else pooled); hit when the first published linked item falls inside.

How the window is estimated

  1. Lead timeDays from a registration's approval to its first published linked agenda item.
  2. ConditionKeep past lead times longer than the days this registration has already waited.
  3. WindowThe middle half (25th to 75th percentile) of those lead times.

A window is a statistical estimate from past registrations, not a prediction that council will consider the matter. Many registrations never lead to an agenda item.