Registered lobbyist
Matt Fetter
- Clients
- 1
Clients by year
Top clients
RegistrationsSubjects
- Transportation - Roads / Bridges3
- Fleet Services2
- Transportation - Cycling / Bicycle Lanes2
- Signs2
- Transportation1
Clients by year· 3 rows
| Year | Client | Registrations |
|---|---|---|
| 2023 | Stinson Equipment Limited | 1 |
| 2020 | Stinson Equipment Limited | 1 |
| 2018 | Stinson Equipment Limited | 2 |
Offices contacted
Communications per year
2023 to 20231 communication
How and with whom
By method · 0 meetings
By office holder
Most-contacted offices
Meeting rate
Share of this lobbyist's communications recorded as a meeting, presentation or video meeting
Rates are reported only above 20 contacts. Some subjects are mostly handled by email, so rates are best compared within subject category.
Offices contacted· 1 row
| Office | Office holder type | Communications | Meetings | Last contact |
|---|---|---|---|---|
| Fleet Services | City staff | 1 | 0 | 3 October 2023 |
Registrations
Registrations by start year
Status
Data table· 4 rows
| Registration | Client | Subject matter | Dates | Status | Communications |
|---|---|---|---|---|---|
| SM34863 | Stinson Equipment Limited | Fleet Services; Transportation; Transportation - Cycling / Bicycle Lanes | 3 October 2023 – 31 December 2024 | closed by lro | 1 |
| SM30475 | Stinson Equipment Limited | Signs; Transportation - Cycling / Bicycle Lanes; Transportation - Roads / Bridges | 24 August 2020 – 31 December 2021 | closed by lro | 0 |
| SM26236 | Stinson Equipment Limited | Fleet Services; Signs; Transportation - Roads / Bridges | 31 May 2018 – 31 December 2018 | closed by lro | 0 |
| SM26271 | Stinson Equipment Limited | Transportation - Roads / Bridges | 24 May 2018 – 3 December 2018 | closed by lro | 0 |
Linked agenda items
This link is inferred by lobbyTO; the registry does not record which agenda item a registration concerns.
Links between records are inferred by a model and are not reviewed by a person. Each link shows its score out of 1; moderate-confidence links (0.7 to 0.9) are wrong more often than high-confidence links. How links are scored
Updates on Vision Zero Road Safety Plan
Item 2024.IE18.1 · meeting 27 November 2024 · first recorded vote 17 December 2024 · from registration SM34863
Evidence Moderate confidence · score 0.71
A model scored this link between 0.7 and 0.9 out of 1. Links are not checked by a person, and links in this range are wrong more often: check the evidence before relying on it.
Source records
- Registration SM34863: Fleet Services - lobbying in regards to traffic safety equipment on fleet vehicles Bike Lanes - Lobbying in regards to safety devices used for bike lane delineation Transportation - Lobbying regarding traffic safety devices used in construction projects (Lobbyist Registry)
- Agenda item 2024.IE18.1: Updates on Vision Zero Road Safety Plan (TMMIS)
No further evidence was recorded for this link.
Bike Lanes that are Safe and Passable for Bikes
Item 2024.IE10.3 · meeting 9 January 2024 · first recorded vote 7 February 2024 · from registration SM34863
Evidence High confidence · score 0.92
A model scored this link 0.9 or higher out of 1. Links are not checked by a person; links scored this high are usually right but can be wrong.
Source records
- Registration SM34863: Fleet Services - lobbying in regards to traffic safety equipment on fleet vehicles Bike Lanes - Lobbying in regards to safety devices used for bike lane delineation Transportation - Lobbying regarding traffic safety devices used in construction projects (Lobbyist Registry)
- Agenda item 2024.IE10.3: Bike Lanes that are Safe and Passable for Bikes (TMMIS)
No further evidence was recorded for this link.
Former-official status
No match with a former member of council, councillor staff or City staff. A match appears only when a decision model comparing the two records scores it 0.95 or higher.
Disclosure timeliness
Lobbyists must record a communication within 3 days. lobbyTO measures the gap between a communication's date and the first daily snapshot of the registry export in which it appears. The export refreshes daily, so a 1-day gap is expected.
Measurement in progress. Daily snapshots began on 4 October 2026 (40 days of snapshots so far); results appear after 6 months of snapshots, from 4 April 2027. Communications dated before the first snapshot are not measured.