lobbyTO

Development application · Site Plan Approval (SA)

Development application 20 146806 WET 03 SA

3199 Lake Shore Blvd W

Status
Under Review
In progress
Submitted
20 May 2020
No appeal recorded
Linked lobbying registrations
0
None published
Communications on linked registrations
0

Application record

Type
Site Plan Approval (SA)
Addresses
3199 Lake Shore Blvd W
Ward
Ward 3 · Amber Morley
Submitted
20 May 2020
Status
Under Review
Outcome recorded
In progress
Decision date
Not recorded in the open data
Appealed
No appeal recorded
Related file
20 146801 WET 03 OZ

Source: City of Toronto open data (Development Applications; Committee of Adjustment Applications). Dataset page · City application page

Description

INACTIVE Site Plan Control application to permit the proposed Humber Cultural Hub which is a phased institutional development as part of the Humber College Lakeshore Campus. The proposal includes the partial redevelopment of the existing building with the construction of multiple building additions that would be developed in two phases. The first phase would include the construction of an 8 student residence building that would be connected by 1 to 4-storey academic podiums. The second phase would include a new 3-storey academic podium, with a music and performing arts hall, which would connect to the first phase. The existing 6-storey student residence fronting Lake Shore Boulevard West would remain, as well as the existing 2 and 3-storey library building which would connect to the proposed development. The existing 2-storey academic building component located in the center of the site would be demolished and a portion of the existing surface parking lot would be removed to facilitate the proposal.The total gross floor area of the institutional development would be 49,611 m², of which 30,380 m² would be attributed to the proposed development and 19,231 m² would be attributed to the existing buildings that would be retained on the site.

Linked lobbying registrations

No published lobbying registrations are linked to this application.

Other registrations that mention this application's addresses

Text matches on the address only. They are not linked to this application unless listed above.

None.

Comparison with similar applications

Lobbied applications are compared only with unlobbied applications of the same type, in the same ward, submitted in the same year and of the same size band (units or floor area from the description; sub-type for Committee of Adjustment files). Unlobbied applications are weighted to match the lobbied group. Raw lobbied versus unlobbied averages are not reported.

Site Plan Approval (SA), Ward 3

24 lobbied · 100 matched

Median days

  • Lobbied—
  • Matched, unlobbied1,629

Approval rate

  • Lobbied100% n=5
  • Matched, unlobbied70% n=10

Refusal rate

  • Lobbied0%
  • Matched, unlobbied30%

Appeal rate

  • Lobbied4%
  • Matched, unlobbied4%

Site Plan Approval (SA), City-wide

449 lobbied · 1,237 matched

Median days

  • Lobbied—
  • Matched, unlobbied727

Approval rate

  • Lobbied100% n=61
  • Matched, unlobbied97% n=96

Refusal rate

  • Lobbied0%
  • Matched, unlobbied3%

Appeal rate

  • Lobbied4%
  • Matched, unlobbied3%
Data table· 4 rows
Site Plan Approval (SA), Ward 3: 24 lobbied and 100 matched unlobbied applications in 18 matched strata
GroupnMedian daysApproval rateRefusal rateAppeal rateCouncil items
Lobbied24—100% (n=5)0%4%0.25
Matched, unlobbied1001,62970% (n=10)30%4%0.14
Site Plan Approval (SA), City-wide: 449 lobbied and 1,237 matched unlobbied applications in 307 matched strata
GroupnMedian daysApproval rateRefusal rateAppeal rateCouncil items
Lobbied449—100% (n=61)0%4%0.07
Matched, unlobbied1,23772797% (n=96)3%3%0.04

Submission to the first decision status seen in our daily loads (measured from launch). Approval and refusal rates are among applications with a recorded decision.

Large and complex applications attract both lobbying and longer reviews, and matching cannot remove every difference between applications, so a difference does not show that lobbying changed how an application was reviewed.

Lobbyists choose whom to contact, so a difference does not show a change of mind.